Friday, September 22, 2006

Back to Work!

I am back to work on more 100 Good Wishes projects. I have started working on a smaller (crib size) quilt that Dori can drag all over if she wants. I am making a small doll size one to match so her 'babies' can match! I am doing crazy quilt design and will probably put light yellow sashing in between all the blocks.

I've been busy getting things ready for our new addition. I have my sewing room all cleaned up and organized. I will be moving all my sewing and craft stuff out to make way for our teen to move in. Then each kid will have their own room.

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home